Structure demolition in action at 470 Cade Loop

470 Cade Loop Demolition

Ingram, TX

A.M. Pitts Construction performed complete demolition and haul-off services for two older riverside cabins at 470 Cade Loop in Ingram that sustained flood damage during the severe Kerr County flooding. This residential demolition project required careful equipment operation in a wooded setting with mature trees and uneven terrain left by the flood events.

Demolition Scope

Structures Removed:

  • Two single-story wood-frame cabins with metal roofing
  • Screened porch additions and wooden decking
  • All associated foundation materials

Preserved Elements:

  • Stone chimney structure carefully preserved at owner's request, requiring methodical removal of surrounding wood structure

Site Clearing:

  • Complete debris removal and haul-off to appropriate facilities
  • Grading and leveling of cleared building footprints
  • Preservation of mature oak trees throughout the property
  • Final site cleanup leaving lot ready for future development

Operational Considerations

The project presented specific challenges working on flood-affected property:

  • Precision Demolition: Carefully dismantling wood structures around the stone chimney to preserve it intact
  • Terrain Management: Navigating equipment around established trees and natural grade changes in the wooded lot
  • Debris Handling: Careful sorting and removal of flood-damaged building materials
  • Access Coordination: Managing equipment movement on the residential street without disrupting neighboring properties
  • Environmental Care: Protecting surrounding vegetation during demolition and debris loading operations

Equipment & Process

We utilized our Hitachi excavator with grapple attachment for controlled structure dismantling, allowing us to carefully separate and load materials while working around the mature tree canopy and preserving the stone chimney. Roll-off containers were strategically positioned for efficient debris management and multiple haul-off trips to complete the cleanup.

The cleared lots provide the property owner with a clean slate for rebuilding or redevelopment following the flood damage, with all structures and debris professionally removed, the chimney preserved as requested, and the site restored to grade.

Structure to be demolished at  470 Cade Loop
Structure to be demolished at  470 Cade Loop
Structure to be demolished at  470 Cade Loop
Structure to be demolished at  470 Cade Loop
Structure to be demolished at  470 Cade Loop
Structure to be demolished at  470 Cade Loop
Structure to be demolished at  470 Cade Loop
Structure demolition in action at 470 Cade Loop
Structure demolition in action at 470 Cade Loop
Land clearing after structure demolition at 470 Cade Loop
Cleared land post structure demolition at 470 Cade Loop

A.M. Pitts Construction

(512) 917-4243 mpitts@ampittsco.com
Map of all locations
Serving the Greater Central Texas area.
Monday - Saturday
7:00AM to 5:00PM
Sunday
Closed
Payment Methods: Cash, Check, Bank Transfer

Payment terms are project-specific and discussed during the initial consultation. For larger projects, we typically require a deposit with flexible payment schedules throughout the project lifecycle. We work with clients to establish payment structures that align with project milestones and scope. Contact us for a free estimate and detailed payment information for your specific project.

© 2026 A.M. Pitts Construction. All rights reserved | Powered by Local Victor